top of page
Search

Townline Elementary Taking Shape

  • Owen-Ames-Kimball Co.
  • Aug 8
  • 1 min read

Construction at Townline Elementary is racing forward, with big changes happening inside and out.


The old gym has been torn down and rebuilt as part of a new 17,000-square-foot addition, while brand-new windows now brighten classrooms throughout the building. Renovations are well underway, including updated ceilings in the corridors.


Outside, a new curb was poured in mid-July, which is shaping site traffic, and a larger cafeteria is rising to serve the school’s growing needs. The playground is expanding with more space and blacktop, and a new detention pond is in place for stormwater management.


With each update, Townline is moving closer to welcoming students back to a refreshed, expanded school. Check out the photos below to see the updates.


Townline Elementary's new gymnasium
Townline Elementary's new gymnasium
The exterior of the new gymansium.
The exterior of the new gymansium.
An interior hallway with a view
An interior hallway with a view
Exterior sitework for a new parking lot.
Exterior sitework for a new parking lot.
A new cafeteria inside is taking shape.
A new cafeteria inside is taking shape.

 
 
 
O-A-K Logo

BROUGHT TO YOU
BY O-A-K

Owen-Ames-Kimball Co. is our construction management partner.

SUBSCRIBE VIA EMAIL

Thanks for submitting!

© 2021 by Owen-Ames-Kimball Co., Grand Rapids, Michigan

bottom of page