top of page
Search

Summer Construction Ramps Up at Pinewood Middle School

  • owen-ames-kimball
  • Jun 26
  • 1 min read

With school out for the summer, construction has shifted into full gear at Pinewood Middle School. Equipment, fencing and materials dot the landscape around the front entrance and inside the hallways of the school.

A new office addition is underway that will feature the principals office as well as a conference room and other administration offices for the school.

Additionally, a new entrance and main entryway is being constructed at the front of the school. Here are some pictures below to show the progress.

The new main entrance to Pinewood Middle School.
The new main entrance to Pinewood Middle School.
Pinewood Middle School's office addition.
Pinewood Middle School's office addition.
The new entryway to the main office of Pinewood Middle School.
The new entryway to the main office of Pinewood Middle School.
The interior shot of the new entryway.
The interior shot of the new entryway.
Office addition interior
Office addition interior
Office addition interior
Office addition interior

 
 
 

תגובות


O-A-K Logo

BROUGHT TO YOU
BY O-A-K

Owen-Ames-Kimball Co. is our construction management partner.

SUBSCRIBE VIA EMAIL

Thanks for submitting!

© 2021 by Owen-Ames-Kimball Co., Grand Rapids, Michigan

bottom of page