School is out for the summer and construction is ramping up at Bowen Elementary in time to finish before the fall. The roof over the cafeteria and gymnasium has been added, concrete floors have been poured, and equipment in the kitchen area of the addition has been installed.
In the current school building, locker rooms and cabinets have been removed in preparation for new ones to be installed.
Comments